About | Contact | JOIN

Job-site inspection

What? A job-site inspection is to be conducted by a safety director, superintendent or someone else authorized by the sponsoring company.

Format? Checklists

How much time will it take? Approximately one hour (This can be repeated until satisfactorily completed.)

Why is this required? Setting up and maintaining a job site with all correct safety measures is a must. Under no circumstances should a participant receive a satisfactory inspection rating if fall-protection measures are not correct.

How is credit awarded? Inspection checklists need to be emailed, mailed or faxed to NRCA University.

Mail: NRCA University
  ProForeman Program
  10255 W. Higgins Road
  Suite 600
  Rosemont, IL 60018
Telephone: (866) ASK-NRCA (275-6788)
Fax: (847) 299-1183
Email: proforeman@nrca.net








Roofing industry news

[ More news ]
Advertisement

Find a contractor

Roof type

ZIP Code
 

Find roofing contractors by state

Sponsored links