Abstract
Construction sequencing pressures roofing contractors to install roofing materials during unsuitable weather or before blocking, curbs, penetrations or walls are complete—all of which may cause problems. Installing a temporary roof system can help avoid such problems by providing interim protection for other trades so they can stay on schedule; it also reduces traffic on the finished roof until the permanent roof system is installed.
Construction sequencing pressures roofing contractors to install roofing materials during unsuitable weather or before blocking, curbs, penetrations or walls are complete—all of which may cause problems. Installing a temporary roof system can help avoid such problems by providing interim protection for other trades so they can stay on schedule; it also reduces traffic on the finished roof until the permanent roof system is installed.
Date
9/2026
9/2026
Author(s)
Maciek Rupar
Maciek Rupar
Page(s)
16-18
16-18
Keyword(s)
construction; roof; penetration; wall
construction; roof; penetration; wall