Abstract
Construction sequencing pressures roofing contractors to install roofing materials during unsuitable weather or before blocking, curbs, penetrations or walls are complete—all of which may cause problems. Installing a temporary roof system can help avoid such problems by providing interim protection for other trades so they can stay on schedule; it also reduces traffic on the finished roof until the permanent roof system is installed.
Date
9/2026
Author(s)
Maciek Rupar
Page(s)
16-18
Keyword(s)
construction; roof; penetration; wall



Note: Documents in this section are provided as Adobe Acrobat PDF files. In order to print and view PDF files, the Adobe Acrobat Reader software/plugin, which runs on Microsoft Windows, Macintosh, OS/2 and various versions of UNIX, must be installed on your computer. Adobe Acrobat Reader is available for download as freeware from Adobe Acrobat's website. Please note that the resolution of on-screen versions is not as high as printed versions of PDF files.

Advertisement

Subscribe for Updates Join 25,000+ roofing professionals following NRCA

Subscribe to NRCA